Found this site with neat procedural track:
http://www.banbyggarna.se/stl/scenery/track/page1.html
Nice old timey look!
Thanks to the creators.
Harold
Old time procedural track
Re: Old time procedural track
Took the lighter rail from the 831mm/3 foot track and put it in the SG track:
Lightweight procedural track!
Harold
Lightweight procedural track!
Harold
Re: Old time procedural track
One of the nice things about the procedural track is the ability to mix and match components. I'm still waiting until they support stub switches before I do to much work with upgrading to procedural track - I have enough other things to work on.....
Re: Old time procedural track
Be nice to have your track as procedural even without stubs.
The TANE SWE with ballast and small rail:
Harold
The TANE SWE with ballast and small rail:
Harold